ARK Apartments

 Location: 5-7 Browns Avenue, Ringwood

 Client: Roclar Constructions

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete columns, concrete stairs, suspended slab and beams

 Value: $8.5M ($1.9M)

 Duration: March 2017 – October 2017

Description: The ARK Apartments comprises 5 levels of modern residential living with 38 one and two bedroom residences

 

 

 

 

Cape Vue Apartments

 Location: 68 Cape Street, Heidelberg

 Client: Leda Construction

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete columns,
concrete stairs, suspended slab and beams

 Value: $20M ($1.8M)

 Duration: February 2017 – September 2017

Description: The pinnacle in apartment design for peerless contemporary living, Cape Vue is an innovative project in Heidelberg offering 52 apartments with cutting-edge style, luxuriously large spaces and inspirational views.

The Bentleigh Apartments

 Location: 15 Bent Street, Bentleigh

 Client: Jitika Construction

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete
columns, concrete stairs, suspended slab and beams

 Value: $4.5M ($1M)

 Duration: April 2017 – July 2017

Description: Attractive, contemporary residence with 18 spacious apartments across 4 floors

The Cooper Development

 Location: 2 Ambrose-Treacy Drive, Bundoora

 Client: Fynnan Construction

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete columns, concrete stairs, suspended slab and beams

 Value: $10M ($750K)

 Duration: April 2016 – June 2017

Description: An exciting development in a sought after location in Bundoora, this project features 27 attractive Townhouses complete with four bedroom, three bathroom and double garage.

Churchill Apartments

 Location: 2 Churchill Road, Ringwood

 Client: Dwell Group

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete columns,
concrete stairs, suspended slab and beams

 Value: $6.5 M ($2.2)

 Duration: September 2016 – January 2017

Description: Churchill Apartments set the standard in luxury apartment living in Ringwood. With 48 apartments over 5 levels situated on a quiet residential street within walking distance of local shops and cafes.

The Manor

 Location: 347 Glenferrie Road, Malvern

 Client: RK Developers

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete
columns, concrete stairs, suspended slab and beams

 Value: $6.5M ($750K)

 Duration: October 2016 - February 2017

Description: An elegant and luxurious four-storey building comprising 22 apartments, each enjoying its own unique aspect and offering three bedroom configurations with huge open plan living areas, generous courtyard and terrace spaces with two secure car spaces.

The Carlisle Apartments

 Location: 88 Carlisle Street, St Kilda

 Client: Element Five

 Services engaged: Formwork for superstructure – ground floor slab, floor slab (1st to 4th floor), stairs and ramp

 Value: Total project value $8M (FormPro Group component - $660K)

 Duration: 5 months (April 2016 – August 2016)

Description: The Carlisle Apartments is a new corner site apartment project comprising 68 modern design apartments across 5 levels.

image 1

image 2

image 3

image 4

image 5

Moonee Ponds Multi-level Development

 Location: Shuter Street, Moonee Ponds

 Client: Syndicate Property Group

 Services engaged: All 3 disciplines – Formwork, Steel Fixing, Concrete footings, concrete columns, concrete stairs, suspended slab and beams

 Value: Total project value $1m (FormPro component $207K)

 Duration: July 2016 – September 2016 (3 months)

Description: Attractive, contemporary apartments with shopfront and undercover carpark (6 large modern living apartments across 4 levels)

image 1

image 2

image 3

image 4

Watersun Homes Residential Project

 Location: 37 Embling Road, Malvern

 Client: AG Construct

 Services engaged: All 3 disciplines – Formwork, Steel Fixing,

Concrete footings, concrete columns, concrete stairs, suspended slab and beams

 Value: Total project: $1.5M (FormPro component $235K)

 Duration: April 2016 – June 2016 (3 months)

Description: Building and construction of new modern, luxury home featuring the latest in design and customised for outstanding livability, comfort and style

image 1image 2image 3image 4

 

 

 

 

Malvern Townhouse Dual Occupancy

 Location: 15 Spring Road, Malvern

 Client: R&K Developers

 Services engaged: All 3 disciplines – Formwork, Steel Fixing,

Concrete footings, concrete columns, concrete stairs, suspended slab and beams

 Value: Total project: $1.7M (FormPro component $234K)

 Duration: November 2015 – January 2016 (3 months)

Description: This unique dual occupancy property comprised the construction of two substantial executive residences showcasing 4 spacious bedrooms, expansive living spaces and a home theatre room set over 3 levels serviced by a private lift and private 6 car garage.

1st image2nd image3rd image4th image5th image6th image

 

 

 

 

Insignia Apartments

 Location: 264 Waterdale Road, Ivanhoe

 Client: SWAT Building

 Services engaged: Formwork for super structure:

columns, suspended ramps, stairs, suspended slabs and beams

 Value: Total project value $6M (FormPro Group component - $830K)

 Duration: 8 months (May 2015 – December 2015)

Description: Insignia Apartments is an innovative 4-level boutique development of 46 Apartments set on a substantial corner site

image 1image 2image 3image 4image 5image 6image 7image 8image 9

The Heid Apartments

 Location: 254 Bell Street, Heidelberg Heights

 Client: SWAT Building

 Services engaged: Formwork for super structure:

columns, suspended ramps, stairs, suspended slabs and beams

 Value: Total project value $4M (FormPro Group component - $409K)

 Duration: 8 months (May 2015 – December 2015)

Description: The Heid Apartments comprises 5 levels of sophisticated apartment living with 28 one and two bedroom residences

 

heid_03 HEI_FOLIO_6 heid_02

Malvern Apartments

 Location: 1524 Malvern Road, Glen Iris

 Client: Magnus Construction

 Services engaged: All three disciplines:

formwork, steel fixing, concrete footings, concrete columns, concrete stairs, suspended slabs and beams

 Value: Total project value $3M (FormPro Group component - $650K)

 Duration: 8 months (May 2015 – December 2015)

Description: Malvern Apartments comprises a 3-level residential block with 18 one and two bedroom residences

 

1st photo 2nd photo 3rd photo 4th photo 1st photo

Burke Hill Apartments

 Location: Corner Malvern and Burke Road, Glen Iris

 Client: Dwyer Builders

 Services engaged: All three disciplines:

formwork, steel fixing, concrete footings, concrete columns, concrete stairs, suspended slabs and beams

 Value: Total project value $5M (FormPro Group component - $830K)

 Duration: 8 months (May 2015 – December 2015)

Description: Malvern Apartments comprises a multi-storey structure with 18 one and two bedroom residence

 

1st photo 2nd photo 3rd photo 4th photo 5th photo

The Heyington Warehouse

 Location: 15 Heyington Avenue, Thomastown

 Client: Fynnan Constructions

 Services engaged: All three disciplines:

sub-base preparation, application of structural Geomap, board piers, concrete footings, concrete stairs, infil slabs suspended slabs and beams, loading dock and concrete driveway and carpark

 Value: Total project value $12M (FormPro Group component - $1.4K)

 Duration: 6 months (September 2012 – January 2013)

Description: Brand new 7,500 square warehouse space built as a Blind material manufacturing site

 